Lic #B1027903
Title 24 Compliance
Back to Home
Builders & Developers Division • CSLB Lic #B1027903

Title 24 Energy
Compliance & Plan Checks.

Guaranteed California energy code compliance with rapid 48-hour CAD turnarounds and 100% city inspection pass rates for residential general contractors.

Title 24 Blueprints
Rapid CAD Turnaround

Guaranteed Permit Approval

We partner directly with Southern California developers to handle mandatory photovoltaic layouts, battery-ready infrastructure, and rapid rough-in electrical documentation without project delays.

48-Hour Plan Check
100% City Pass Rate
Skilled Installation Teams
Full Code Guarantee
Builder Division

Need fast Title 24 approval?

Builder Hotline: 619-436-1997
California energy compliance

Title 24 project FAQs

Practical answers for builders and developers coordinating solar, storage, and electrical scope.

1Which projects may trigger Title 24 solar requirements?
Requirements depend on the building type, project scope, climate zone, and the energy documents approved for the project. New residential construction is a common trigger, but the approved plans govern each job.
2Is battery storage required on every new residential project?
No single answer applies to every project. Battery requirements and exceptions depend on the building classification, compliance pathway, system design, and current California Energy Code.
3When should the solar and electrical team join the project?
Early coordination is best, ideally during design development. It allows roof layout, service sizing, equipment locations, pathways, structural needs, and energy documentation to align before construction.
4Can AD Solar coordinate plans, permits, and inspections?
Yes. Our scope can include system planning, electrical coordination, permit support, installation, inspection corrections, and utility interconnection activities as applicable.
5Can you support ADUs and multi-family developments?
Yes. We support detached and attached ADUs, new homes, and multi-unit projects, with system design and coordination tailored to the approved energy model and site conditions.
6What should builders provide for a proposal?
Send the architectural and electrical plans, approved energy documents when available, roof and structural information, project address, unit count, schedule, and bid instructions.